首页 试题详情
单选题

When installing the clip ring, make sure that the opening is facing forward.

A安装封圈时,确保开口朝前;

B安装卡簧时,确保开口朝上;

C安装卡簧时,确保开口朝前;

正确答案:A (备注:此答案有误)

相似试题

  • 单选题

    When installing the clip ring, make sure that the opening is facing forward.

    答案解析

  • 单选题

    When the spring compresses, the valve opens.

    答案解析

  • 单选题

    Choose the best answer.Where is the default data directory located after installing MySQL using RPM on Oracle Linux 7?

    答案解析

  • 单选题

    The CDS MAINT message shows when:

    答案解析

  • 单选题

    Hardly ______seen the film when the power failed.

    答案解析

热门题库