首页 试题详情
单选题

In some cases, extension of inspection frequencies may be possible if the data suggests that the onset of fatigue problems occurs at a greater number of flight hours than initially predicted.

AA. 在某些情况下,如果数据显示疲劳问题发生频率高于最初预测,则可能需要增加检查频率。

BB. 在某些情况下,如果数据显示疲劳问题持续的时间比最初预测的要长,则可能需要增加检查频率。

CC. 在某些情况下,如果数据显示疲劳问题发生的时间比最初预测的要长,则可能需要增加检查频率。

正确答案:A (备注:此答案有误)

相似试题

  • 单选题

    In some cases, wires are color coded and these should be indicated on the wiring diagram.

    答案解析

  • 单选题

    () speaking,the teaching of Chinese has been neglected to some exten

    答案解析

  • 单选题

    In some cases, wires are color coded and these should be indicated on the wiring Diagram.

    答案解析

  • 单选题

    In some cases, extension of inspection frequencies may be possible if the data suggests that the onset of fatigue problems occurs at a greater number of flight hours than initially predicted.

    答案解析

  • 单选题

    In such cases, the introduction should note the systems covered in the Manual.

    答案解析

热门题库