首页 试题详情
单选题

Get the approval of the design authority before you change the procedure.

A在程序变化之前要得到改装权威部门的批准。

B在更改程序之前要得到设计权威部门的批准。

C在修订程序之前要得到设计权威部门的批准。

正确答案:A (备注:此答案有误)

相似试题

  • 单选题

    Get the approval of the design authority before you change the procedure.

    答案解析

  • 单选题

    Get the approval of the manufacturer before you repair this unit.

    答案解析

  • 单选题

    Get access to the control unit through the opening in the side of the tank.

    答案解析

  • 单选题

    Adjust the length of the rod until you get a minimum clearance of 0.1 in.

    答案解析

  • 单选题

    Any revisions to a Maintenance Manual made necessary due to modifications of an airplane after delivery are the responsibility of the holder of the type design approval of the modification as appropriate for type certification.

    答案解析

热门题库