首页 试题详情
单选题

The difference between the expected (or required) return for the market portfolio and the risk-free rate of return is referred to as ( ).

Abeta

Bthe geometric mean

Cthe market risk premium

Dthe arithmetic mean

正确答案:A (备注:此答案有误)

相似试题

  • 单选题

    The difference was _____ cross the river.

    答案解析

  • 单选题

    The maximum permitted difference is 5 mm.

    答案解析

  • 单选题

    What is the difference between a RIB and a FIB?

    答案解析

  • 判断题

    The market risk premium is the expected difference between the return on the market and the project return.

    答案解析

  • 单选题

    The difference between the two dimensions must not be more than 0.10mm.

    答案解析

热门题库