首页 试题详情
单选题

( ) describes,in detail,the project’s deliverables and the work required to create those deliverables.

AProduct scope description

BProject objectives

CStakeholder Analysis

DThe project scope statement

正确答案:A (备注:此答案有误)

相似试题

  • 单选题

    describesin detail,the project’s deliverables and the work required to create those deliverables.

    答案解析

  • 单选题

    The (describes, in detail, the project’s deliverables and the work required to create those deliverables.

    答案解析

  • 单选题

    (售前售后联系微信号:newbalance533 禁止商业传播.否则停止更新Which of the following best describes private-sector workplace monitoring in the United States?

    答案解析

  • 单选题

    We have experience in loading data ___ several A/C-manufacturers such as Boeing,Airbus,British Aerospace,Fokker,De Havilland and ATR.

    答案解析

  • 单选题

    De-energize the system.

    答案解析

热门题库